Giriş

This guide will show you how to pull the riser main from the well using three lifting spanners.

This procedure requires four people: one on each of the lifting arms, and one to control the pipe vise. Communication is very important throughout this procedure. If the person handling the pipe vise opens it before everyone is ready, the riser main could drop through the vise and be lost down the well.

Aletler

Hiçbir alete gerek yok.

Parçalar

Hiçbir parçaya gerek yok.

Before performing any repairs, perform a water test on the pump by raising and lowering the handle a full 40 strokes. A properly performing pump will yield greater than 10 liters. Remove the hex head bolt from the top of the access door on the pump head.
  • Before performing any repairs, perform a water test on the pump by raising and lowering the handle a full 40 strokes. A properly performing pump will yield greater than 10 liters.

  • Remove the hex head bolt from the top of the access door on the pump head.

  • On reassembly, this bolt should be hand-tight.

Yorum Ekle

Pull the access door straight up off the pump head. Store the access door in a sanitary place to prevent contamination. Store the access door in a sanitary place to prevent contamination.
  • Pull the access door straight up off the pump head.

  • Store the access door in a sanitary place to prevent contamination.

Yorum Ekle

The access door has a tongue that fits into the base of the pump head. The access door makes a convenient tray to hold nuts and bolts during the disassembly.
  • The access door has a tongue that fits into the base of the pump head.

  • The access door makes a convenient tray to hold nuts and bolts during the disassembly.

Yorum Ekle

Place the spacer collar around the pump rod below the raised chain, with the beveled side down, and the flat side facing up. Place the spacer collar around the pump rod below the raised chain, with the beveled side down, and the flat side facing up. Place the spacer collar around the pump rod below the raised chain, with the beveled side down, and the flat side facing up.
  • Place the spacer collar around the pump rod below the raised chain, with the beveled side down, and the flat side facing up.

Yorum Ekle

The following procedure requires two people. If you attempt to do this alone, you risk injuring yourself and damaging the pump. Lift the pump handle until the base of the chain comes to rest on the spacer collar, and the chain is slack. Hold the handle in this position while the chain is being detached. Lift the pump handle until the base of the chain comes to rest on the spacer collar, and the chain is slack. Hold the handle in this position while the chain is being detached.
  • The following procedure requires two people. If you attempt to do this alone, you risk injuring yourself and damaging the pump.

  • Lift the pump handle until the base of the chain comes to rest on the spacer collar, and the chain is slack. Hold the handle in this position while the chain is being detached.

Yorum Ekle

Using the two access holes, place an angled socket wrench on the bolt and nut attaching the chain to the pump handle. Using the two access holes, place an angled socket wrench on the bolt and nut attaching the chain to the pump handle. Using the two access holes, place an angled socket wrench on the bolt and nut attaching the chain to the pump handle.
  • Using the two access holes, place an angled socket wrench on the bolt and nut attaching the chain to the pump handle.

Yorum Ekle

Hold the wrench on the bolt stationary. Loosen the nut. Loosen the nut.
  • Hold the wrench on the bolt stationary.

  • Loosen the nut.

Yorum Ekle

Remove the nut from the chain bolt. Remove the nut from the chain bolt. Remove the nut from the chain bolt.
  • Remove the nut from the chain bolt.

Yorum Ekle

Remove the washer from the chain bolt. Remove the washer from the chain bolt.
  • Remove the washer from the chain bolt.

Yorum Ekle

Remove the chain bolt. Remove the chain bolt.
  • Remove the chain bolt.

Yorum Ekle

Pull the top of the chain straight off of the pump handle. Pull the top of the chain straight off of the pump handle. Pull the top of the chain straight off of the pump handle.
  • Pull the top of the chain straight off of the pump handle.

Yorum Ekle

Remove the two bolts from the handle side of the pump head. Use one wrench on the bolt and another on the nut beneath. Hold the bolt stationary and loosen the nut. Use one wrench on the bolt and another on the nut beneath. Hold the bolt stationary and loosen the nut.
  • Remove the two bolts from the handle side of the pump head.

  • Use one wrench on the bolt and another on the nut beneath. Hold the bolt stationary and loosen the nut.

Yorum Ekle

Remove the two bolts and nuts from the handle side. Remove the two bolts and nuts from the handle side. Remove the two bolts and nuts from the handle side.
  • Remove the two bolts and nuts from the handle side.

Yorum Ekle

After removing the two handle side bolts, have your partner support the weight of the handle. Remove the two remaining bolts in the same fashion.
  • After removing the two handle side bolts, have your partner support the weight of the handle.

  • Remove the two remaining bolts in the same fashion.

Yorum Ekle

Lift and remove the pump head from the pump. Store the pump head in a sanitary place, preferably above ground, to prevent contamination. Store the pump head in a sanitary place, preferably above ground, to prevent contamination.
  • Lift and remove the pump head from the pump.

  • Store the pump head in a sanitary place, preferably above ground, to prevent contamination.

Yorum Ekle

Slightly twist the head flange, until the corners overhang the top of the tank far enough to grab. Slightly twist the head flange, until the corners overhang the top of the tank far enough to grab.
  • Slightly twist the head flange, until the corners overhang the top of the tank far enough to grab.

Yorum Ekle

Lift the head flange up about one foot above the tank. Lift the head flange up about one foot above the tank. Lift the head flange up about one foot above the tank.
  • Lift the head flange up about one foot above the tank.

Yorum Ekle

Slide the rod clamp around the pump rod, and support it on the tank base. Make sure the pegs in the base of the rod clamp fit into the appropriate holes in the top of the tank. Make sure the pegs in the base of the rod clamp fit into the appropriate holes in the top of the tank.
  • Slide the rod clamp around the pump rod, and support it on the tank base.

  • Make sure the pegs in the base of the rod clamp fit into the appropriate holes in the top of the tank.

Yorum Ekle

Tighten the rod clamp against the pump rod. Be sure the pump rod is centered within the jaws of the clamp and held securely.
  • Tighten the rod clamp against the pump rod.

  • Be sure the pump rod is centered within the jaws of the clamp and held securely.

Yorum Ekle

Lower the head flange. Lower the head flange.
  • Lower the head flange.

Yorum Ekle

Unscrew the chain from the top of the pump rod. Remove the chain. Check the chain for signs of wear or damage.
  • Unscrew the chain from the top of the pump rod.

  • Remove the chain.

  • Check the chain for signs of wear or damage.

  • Set the chain in a sanitary place, such as the access door that was previously removed.

Yorum Ekle

Remove the chain support from around the pump rod. Remove the chain support from around the pump rod. Remove the chain support from around the pump rod.
  • Remove the chain support from around the pump rod.

Yorum Ekle

Remove the jam nut from the top of the pump rod.
  • Remove the jam nut from the top of the pump rod.

Yorum Ekle

Remove the head flange. Remove the head flange. Remove the head flange.
  • Remove the head flange.

Yorum Ekle

Screw the jam nut back onto the top of the pump rod.
  • Screw the jam nut back onto the top of the pump rod.

Yorum Ekle

Screw a T-handle onto the top of the pump rod. Tighten the T-handle up against the jam nut. Screw a T-handle onto the top of the pump rod. Tighten the T-handle up against the jam nut. Screw a T-handle onto the top of the pump rod. Tighten the T-handle up against the jam nut.
  • Screw a T-handle onto the top of the pump rod. Tighten the T-handle up against the jam nut.

Yorum Ekle

Loosen the rod vise. Loosen the rod vise.
  • Loosen the rod vise.

Yorum Ekle

Remove the rod vise from the tank. Remove the rod vise from the tank. Remove the rod vise from the tank.
  • Remove the rod vise from the tank.

Yorum Ekle

Remove the four bolts connecting the tank to the top flange. Use one wrench on the bolt and a second wrench on the nut beneath. Hold the bolt still and loosen the nut. Use one wrench on the bolt and a second wrench on the nut beneath. Hold the bolt still and loosen the nut.
  • Remove the four bolts connecting the tank to the top flange.

  • Use one wrench on the bolt and a second wrench on the nut beneath. Hold the bolt still and loosen the nut.

Yorum Ekle

Twist the tank 45 degrees in order to get a better grasp on it. Twist the tank 45 degrees in order to get a better grasp on it.
  • Twist the tank 45 degrees in order to get a better grasp on it.

Yorum Ekle

Lift the tank straight up, about one foot. The tank is attached to the riser main, and the two must be lifted as a unit. Be careful and get help, as this can be very heavy.
  • Lift the tank straight up, about one foot.

  • The tank is attached to the riser main, and the two must be lifted as a unit. Be careful and get help, as this can be very heavy.

Yorum Ekle

Have a third person place the pipe vise around the riser main, on top of the top flange. Tighten the pipe vise securely around the riser main. Tighten the pipe vise securely around the riser main.
  • Have a third person place the pipe vise around the riser main, on top of the top flange.

  • Tighten the pipe vise securely around the riser main.

Yorum Ekle

Secure the pipe vise to the top flange with two bolts and nuts to hold the pipe vise in place. Secure the pipe vise to the top flange with two bolts and nuts to hold the pipe vise in place. Secure the pipe vise to the top flange with two bolts and nuts to hold the pipe vise in place.
  • Secure the pipe vise to the top flange with two bolts and nuts to hold the pipe vise in place.

Yorum Ekle

Unscrew the tank from the riser main. Unscrew the tank from the riser main. Unscrew the tank from the riser main.
  • Unscrew the tank from the riser main.

Yorum Ekle

Lift the tank up a few inches above the top of the riser main. Lift the tank up a few inches above the top of the riser main.
  • Lift the tank up a few inches above the top of the riser main.

Yorum Ekle

Insert the rod vise between the riser main and the tank, around the pump rod. Tighten the rod vise onto the pump rod.
  • Insert the rod vise between the riser main and the tank, around the pump rod.

  • Tighten the rod vise onto the pump rod.

Yorum Ekle

Unscrew the T-handle from the pump rod and remove it. Keep the T-handle ready to reattach to the pump rod after the tank is removed. Keep the T-handle ready to reattach to the pump rod after the tank is removed.
  • Unscrew the T-handle from the pump rod and remove it.

  • Keep the T-handle ready to reattach to the pump rod after the tank is removed.

Yorum Ekle

Remove the tank. Remove the tank. Remove the tank.
  • Remove the tank.

Yorum Ekle

Place a coupling over the pump rod, on top of the rod vise. Place a coupling over the pump rod, on top of the rod vise.
  • Place a coupling over the pump rod, on top of the rod vise.

Yorum Ekle

Reattach the T-handle to the top of the pump rod. Reattach the T-handle to the top of the pump rod. Reattach the T-handle to the top of the pump rod.
  • Reattach the T-handle to the top of the pump rod.

Yorum Ekle

Loosen and remove the rod vise from the pump rod. The coupling will drop down onto the riser main. The coupling will drop down onto the riser main.
  • Loosen and remove the rod vise from the pump rod.

  • The coupling will drop down onto the riser main.

Yorum Ekle

Screw the coupling onto the end of the riser main. Use a pipe wrench to tighten the coupling onto the riser main.
  • Screw the coupling onto the end of the riser main.

  • Use a pipe wrench to tighten the coupling onto the riser main.

Yorum Ekle

When using the lifting arms, it is essential that each arm have a gap above and below it, and that the openings alternate direction up the pipe.
  • When using the lifting arms, it is essential that each arm have a gap above and below it, and that the openings alternate direction up the pipe.

  • Set the first lifting arm just above (but not touching) the pipe vise.

Yorum Ekle

Add the other two lifting arms. Ensure three things about the arms: They must be equally spaced around the riser main (120° apart).
  • Add the other two lifting arms.

  • Ensure three things about the arms:

    • They must be equally spaced around the riser main (120° apart).

    • The arms must not touch each other, the coupling at the top, or the pipe vise at the bottom.

    • The openings should alternate, to keep the riser main secure.

Yorum Ekle

Communication is very important throughout this procedure. As each person lifts up on their lifting spanner, they announce "got it" to let everyone else know they're holding.
  • Communication is very important throughout this procedure.

  • As each person lifts up on their lifting spanner, they announce "got it" to let everyone else know they're holding.

  • Once all three lifters have announced that they've "got it," loosen the vise.

Yorum Ekle

With the vise loosened, lift up the riser main 1-2 feet. Lift only as high as everyone is comfortable.
  • With the vise loosened, lift up the riser main 1-2 feet.

  • Lift only as high as everyone is comfortable.

Yorum Ekle

Tighten the pipe vise, with the following procedure: Announce "tightening."
  • Tighten the pipe vise, with the following procedure:

    • Announce "tightening."

    • Tighten the vise.

    • Announce "Tight."

Yorum Ekle

Slide the three lifting spanners down on the riser main, into new lifting positions. Again, make sure he lifting spanners don't touch anything above or below, and that they are evenly spaced about the pipe. Again, make sure he lifting spanners don't touch anything above or below, and that they are evenly spaced about the pipe.
  • Slide the three lifting spanners down on the riser main, into new lifting positions.

  • Again, make sure he lifting spanners don't touch anything above or below, and that they are evenly spaced about the pipe.

Yorum Ekle

Once all of the lifters have said "got it," loosen the pipe vise. Once all of the lifters have said "got it," loosen the pipe vise.
  • Once all of the lifters have said "got it," loosen the pipe vise.

Yorum Ekle

Lift the riser main another 1-2 feet. Lift the riser main another 1-2 feet. Lift the riser main another 1-2 feet.
  • Lift the riser main another 1-2 feet.

Yorum Ekle

Tighten the pipe vise, following the same verbal procedure. Repeat the procedure several times:
  • Tighten the pipe vise, following the same verbal procedure.

  • Repeat the procedure several times:

    • Once everyone is securely holding the pipe, loosen the pipe vise.

    • Lift the pipe.

    • Tighten the pipe vise.

    • Slide the lifting spanners down to a new position.

Yorum Ekle

At ten feet, you will reach the first coupling in the riser main. While the three lifters are holding the riser main, the vise operator must open the vise wide enough to let the coupling pass through the jaws.
  • At ten feet, you will reach the first coupling in the riser main.

  • While the three lifters are holding the riser main, the vise operator must open the vise wide enough to let the coupling pass through the jaws.

Yorum Ekle

Lift the riser main up through the pipe vise, until the coupling clears the jaws. Tighten the pipe vise and move the lifting spanners down to a new position. Tighten the pipe vise and move the lifting spanners down to a new position.
  • Lift the riser main up through the pipe vise, until the coupling clears the jaws.

  • Tighten the pipe vise and move the lifting spanners down to a new position.

Yorum Ekle

Lift the riser main high enough that there is room beneath the coupling for the three lifting spanners. Tighten the pipe vise. Tighten the pipe vise.
  • Lift the riser main high enough that there is room beneath the coupling for the three lifting spanners.

  • Tighten the pipe vise.

Yorum Ekle

Use a pipe vise to unscrew the first section of riser main from the coupling. Be careful not to remove the coupling from the lower section of riser main. You may need to use two pipe wrenches to hold the coupling still while you loosen the top section of riser main.
  • Use a pipe vise to unscrew the first section of riser main from the coupling.

  • Be careful not to remove the coupling from the lower section of riser main. You may need to use two pipe wrenches to hold the coupling still while you loosen the top section of riser main.

Yorum Ekle

Unscrew the upper section of riser main from the coupling. Be careful—the pipe will likely be full of water, that will leak out above the coupling as you unscrew the pipe.
  • Unscrew the upper section of riser main from the coupling.

  • Be careful—the pipe will likely be full of water, that will leak out above the coupling as you unscrew the pipe.

Yorum Ekle

Lift the section of pipe straight up from the coupling. Be very careful to hold the pipe as straight up as possible. If it bends or falls over, it may damage the pump rod, or injure someone. Always have at least two people holding the pipe.
  • Lift the section of pipe straight up from the coupling.

  • Be very careful to hold the pipe as straight up as possible. If it bends or falls over, it may damage the pump rod, or injure someone. Always have at least two people holding the pipe.

Yorum Ekle

Place the rod vise on the pump rod between the section of riser main. Tighten the rod vise on the pump rod. Tighten the rod vise on the pump rod.
  • Place the rod vise on the pump rod between the section of riser main.

  • Tighten the rod vise on the pump rod.

Yorum Ekle

Use two wrenches to disconnect the upper section of pump rod from the lower section. Hold the lower section stationary and rotate the upper section. Once detached, lift and remove the upper sections of riser main and pump rod together, and set them down.
  • Use two wrenches to disconnect the upper section of pump rod from the lower section.

  • Hold the lower section stationary and rotate the upper section.

  • Once detached, lift and remove the upper sections of riser main and pump rod together, and set them down.

Yorum Ekle

Remove the T-handle from the top of the pump rod. Remove the T-handle from the top of the pump rod. Remove the T-handle from the top of the pump rod.
  • Remove the T-handle from the top of the pump rod.

Yorum Ekle

Screw the T-handle onto the newly exposed top of the pump rod. Screw the T-handle onto the newly exposed top of the pump rod.
  • Screw the T-handle onto the newly exposed top of the pump rod.

Yorum Ekle

Loosen and remove the rod vise. Repeat the lifting procedure for the remaining sections of riser main and pump rod. Repeat the lifting procedure for the remaining sections of riser main and pump rod.
  • Loosen and remove the rod vise.

  • Repeat the lifting procedure for the remaining sections of riser main and pump rod.

Yorum Ekle

Sonuç

To reassemble your device, follow these instructions in reverse order.

Andrew Optimus Goldberg

Üyelik tarihi: 17-10-2009

368.924 İtibar

1.264 adet Kılavuz yazıldı

Takım

iFixit iFixit üyesi

Community

115 Üyeler

5.778 adet Kılavuz yazıldı

0 Yorum

Yorum Ekle

İstatistikleri Görüntüle:

Son 24 Saat: 0

Son 7 Gün: 0

Son 30 Gün: 6

Her zaman: 227