Ana içeriğe geç

Newport e500 Power Supply Disassembly

Tıbbi Ekipman
iFixit de, bu onarım kılavuzu da tıbbi cihaz üreticisi tarafından onaylanmış değildir ya da herhangi birinin üreticiyle alâkası yoktur.

Neye ihtiyacın var

  1. Newport e500 Power Supply Disassembly, Newport e500 Top Cover Disassembly: adım 1, 1 resimden 1.
    • Place device so that the top cover is facing you.

    • Open the top cover.

  2. Newport e500 Power Supply Disassembly: adım 2, 1 resimden 1.
    • Remove the four hex nuts and lock washers (two at each hinge) that secure the cover to the hinges on the left side of the pneumatic box.

  3. Newport e500 Power Supply Disassembly: adım 3, 1 resimden 1.
    • Remove the cover and set aside. Retain hardware for re-assembly.

  4. Newport e500 Power Supply Disassembly, Newport e500 Left Side Panel Disassembly: adım 4, 1 resimden 1.
    • Carefully place the GDU on its right side with the front of the GDU facing you.

    • Remove the three screws and washers at the top edge of the left side panel.

  5. Newport e500 Power Supply Disassembly: adım 5, 1 resimden 1.
    • Remove the two screws and washers from the underside of the left side panel.

  6. Newport e500 Power Supply Disassembly: adım 6, 1 resimden 1.
    • Remove the left side panel. Retain hardware for re-assembly.

  7. Newport e500 Power Supply Disassembly, Newport e500 Right Side Panel Disassembly: adım 7, 1 resimden 1.
    • Carefully place the GDU on its left side.

  8. Newport e500 Power Supply Disassembly: adım 8, 1 resimden 1.
    • Remove the four screws and washers at the top edge of the right side panel.

  9. Newport e500 Power Supply Disassembly: adım 9, 1 resimden 1.
    • Remove the two screws and washers from the underside of the right side panel.

  10. Newport e500 Power Supply Disassembly: adım 10, 1 resimden 1.
    • Remove the right side panel. Retain hardware for re-assembly.

  11. Newport e500 Power Supply Disassembly, Newport e500 Flow Sensor Cover Disassembly: adım 11, 1 resimden 1.
    • Remove the three screws and washers that secure the flow sensor cover to the pneumatic box assembly. Retain the hardware for re-assembly.

  12. Newport e500 Power Supply Disassembly: adım 12, 1 resimden 1.
    • Remove the flow sensor cover.

  13. Newport e500 Power Supply Disassembly, Newport e500 Pneumatic Box Disassembly: adım 13, 1 resimden 1.
    • Remove the two screws and washers (back corners), one screw and washer (exhalation module support bracket), and two standoffs and washers (front corners) that secure the pneumatic (upper) box assembly to the electronic box assembly. Lift the Pneumatics Box and carefully tilt to one side.

  14. Newport e500 Power Supply Disassembly: adım 14, 1 resimden 1.
    • Remove cables from connectors J1, J2, J3, J4, J5, and J6 on the main PCB (4 connectors are not shown due to being blocked by the side panel). Note the position of these connectors for re-assembly.

  15. Newport e500 Power Supply Disassembly: adım 15, 1 resimden 1.
    • If not already detached, remove the heater cables from J5 and J6 on the DC-DC power supply PCB.

  16. Newport e500 Power Supply Disassembly, Newport e500 Power Supply Disassembly: adım 16, 1 resimden 1.
    • From the underside of the electronics box assembly, remove the four screws and lock washers that secure the power supply to the box assembly.

  17. Newport e500 Power Supply Disassembly: adım 17, 1 resimden 1.
    • Disconnect cables from connectors J1 and J2 on the power supply.

  18. Newport e500 Power Supply Disassembly: adım 18, 1 resimden 1.
    • Lift the power supply out of the electronics box assembly.

Sonuç

To reassemble your device, follow these instructions in reverse order.

Jared McMullen

Üyelik tarihi: 05/02/18

473 İtibar

4 adet Kılavuz yazıldı

Ekip

Cal Poly, Team S7-G16, Paton Spring 2020 Cal Poly, Team S7-G16, Paton Spring 2020 üyesi

CPSU-PATON-S20S7G16

3 Üyeler

13 adet Kılavuz yazıldı

0 Yorum

Yorum Ekle

İstatistikleri Görüntüle:

Son 24 Saat: 0

Son 7 gün: 5

Son 30 gün: 15

Her zaman: 122