Ana içeriğe geç

9. Adımdaki Değişiklikler

Düzenleyen: Jillian Oliver

Düzenleme onaylandı tarafından Jillian Oliver

Önce
Sonra
Değiştirilmemiş

Adım Satırları

[* red] Connect the box to the turbine control board (Pl1.J6.CT).
-[* black] Couple the flow rate measurement block (Pl1-260) to the casing and connect the two O2 supply pipes and the piezo solenoid valve, then reinsert the assembly into its housing. Put the cone support (Pl1-50) also into place. Put the cone support (Pl1-220) also into place.
+[* black] Couple the flow rate measurement block (Pl1-260) to the casing and connect the two O2 supply pipes and the piezo solenoid valve.
+[* black] Then, reinsert the assembly into its housing. Put the cone support (Pl1-50) into place. Put the additional cone support (Pl1-220) also into place.