Ana içeriğe geç

10. Adımdaki Değişiklikler

Düzenleyen: Peter Lam

Düzenleme onaylandı tarafından Peter Lam

Önce
Sonra
Değiştirilmemiş

Adım Satırları

-[* black] Place the SL, SR and sync buttons into the new charging rail and make sure the tabs on the SL and SR buttons fit into the grooves on the socket they are being placed into.
+[* black] Place the SL, SR and sync buttons into the new charging rail and make sure the tabs on the SL and SR buttons fit into their respective socket grooves.
[* black] Place the PCB over the buttons and secure it in place using the two golden 3mm Phillips #000 screws.
[* icon_caution] Potential for device damage. If buttons are not properly placed into charging rail, the PCB will not fit overtop of the buttons. Proceeding to screw in PCB will warp the PCB.