15. Adımdaki Değişiklikler
Düzenleyen: Phillip Takahashi —
- Önce
- Sonra
- Değiştirilmemiş
Adım Satırları
[* black] First align the bolt holes of the tank hinge base. | |
[* black] Place the hinge base bolts into their holes and turn them clockwise by hand a few turns. Do not tighten them yet. | |
[* black] Align the the front mounting bolt holes and place the front mounting bolts into their respective holes. Turn the bolts clockwise by hand a few turns. | |
[* icon_reminder] Don't forget to put the small metal inserts back into the front mounting holes if you removed them earlier. | |
- | [* black] Tighten |
+ | [* black] Tighten the 4 tank mounting bolts with a socket wrench or box end wrench until snug. |