Adım 12 çevriliyor
Adım 12
-
Here is the importance of a visual inspection.
-
Blown caps, check bulges on top of caps,
-
as well as charring on the board itself.
-
all of these capacitors have definitely failed. Again, check the tops for bulging.
-
The power board has three fuses, those should be checked for continuity with a multimeter.
Katkılarınız, açık kaynak Creative Commons lisansı altında lisanslanmaktadır.