Ana içeriğe geç
İngilizce
Çince
Adım 9
Before re-installing the primary chain inspection cover, make sure the rubber O-ring on the inside of the primary chain inspection hole is clean and properly seated. Also make sure that the rubber o-rings are clean and in proper condition before replacing the screws in the primary chain inspection cover. Using a 5/32" Hex or Allen screw head, re-install the primary chain inspection cover.
Re-assembly
  • Before re-installing the primary chain inspection cover, make sure the rubber O-ring on the inside of the primary chain inspection hole is clean and properly seated.

  • Also make sure that the rubber o-rings are clean and in proper condition before replacing the screws in the primary chain inspection cover.

  • Using a 5/32" Hex or Allen screw head, re-install the primary chain inspection cover.

在重组主链检查盖时请确保O型橡胶垫圈在主检查口之中同时也要确保它的位置是正确的和干净的。

同时也要确保主链检查盖螺丝下的O型橡胶垫圈也是清洁的以及处于正确的位置。

使用 5/32"六角扳手 或六角螺丝刀重新安装主链检查盖

Katkılarınız, açık kaynak Creative Commons lisansı altında lisanslanmaktadır.