Ana içeriğe geç

CR-10S PRO Y Axis Linear Rail Kit Installation

Neye ihtiyacın var

  1. CR-10S PRO Y Axis Linear Rail Kit Installation, Machine Prep for linear rail kit: adım 1, 1 resimden 1.
    • Remove Bed leveling knobs

    • Be careful when lifting the bed off the Y Carriage. The springs may fall when lifting the bed up.

    • Lift bed and set to the back left side of the printer

  2. CR-10S PRO Y Axis Linear Rail Kit Installation, Frame Bolts Swap: adım 2, 3 resimden 1. CR-10S PRO Y Axis Linear Rail Kit Installation, Frame Bolts Swap: adım 2, 3 resimden 2. CR-10S PRO Y Axis Linear Rail Kit Installation, Frame Bolts Swap: adım 2, 3 resimden 3.
    • Note: uses the stock CR10S Pro Y carriage with Vslot wheels assembly to keep the rails aligned while replacing the frame bolts

    • Remove with M5X30 SHCS one at a time

    • Replace with M5X30 BHCS

    • Slide Y carriage off from the front of the machine

  3. CR-10S PRO Y Axis Linear Rail Kit Installation, Rail Prep Instructions: adım 3, 1 resimden 1.
    • Remove from packaging

    • Note, do not touch the rail directly with your hands.

    • Wipe down rail with a lint free cloth

    • Add grease to the grease port on each side of the rail

  4. CR-10S PRO Y Axis Linear Rail Kit Installation: adım 4, 3 resimden 1. CR-10S PRO Y Axis Linear Rail Kit Installation: adım 4, 3 resimden 2. CR-10S PRO Y Axis Linear Rail Kit Installation: adım 4, 3 resimden 3.
    • Pre-insert Spring loaded and use an Allen wrench or screwdriver to help align

    • M3 Spring loaded T-nut

    • Use the circled Rail mounting positions

    • 16x M3x8 SHCS

    • Picture with MGN guide on rail

  5. CR-10S PRO Y Axis Linear Rail Kit Installation, Rail Adapter Plate install: adım 5, 2 resimden 1. CR-10S PRO Y Axis Linear Rail Kit Installation, Rail Adapter Plate install: adım 5, 2 resimden 2.
    • Tighten the screws evenly in an X shape

    • 4x Adapter Plate

    • 16x M3x6 FHCS

  6. CR-10S PRO Y Axis Linear Rail Kit Installation, Stock Y carriage Plate Prep: adım 6, 3 resimden 1. CR-10S PRO Y Axis Linear Rail Kit Installation, Stock Y carriage Plate Prep: adım 6, 3 resimden 2. CR-10S PRO Y Axis Linear Rail Kit Installation, Stock Y carriage Plate Prep: adım 6, 3 resimden 3.
    • Remove all Vslot wheels and bolts

    • Install endstop Trigger at this location

    • Picture 2 shows endstop Trigger install

    • M5x35 SHCS

    • 3x Stock Vslot wheel spacers

    • M5 Nylon Ring Lock Nut

  7. CR-10S PRO Y Axis Linear Rail Kit Installation, Y Carriage Plate install: adım 7, 3 resimden 1. CR-10S PRO Y Axis Linear Rail Kit Installation, Y Carriage Plate install: adım 7, 3 resimden 2. CR-10S PRO Y Axis Linear Rail Kit Installation, Y Carriage Plate install: adım 7, 3 resimden 3.
    • Belt mounting holes goes on the right side of the priter

    • Left side screws

    • Some early kits are drilled and taped for M5 Screws. The M4x8 FHCS is substituted for a M5x10 FHCS and the M4x10 BHCS substituted for M5x10 BHCS.

    • 2x M4x8 FHCS

    • Right screw stack order

    • M4x10 BHCS - M4 washer - M4 Large OD washer

    • Tightened the left side screws first

  8. CR-10S PRO Y Axis Linear Rail Kit Installation, Belt spacer install: adım 8, 3 resimden 1. CR-10S PRO Y Axis Linear Rail Kit Installation, Belt spacer install: adım 8, 3 resimden 2. CR-10S PRO Y Axis Linear Rail Kit Installation, Belt spacer install: adım 8, 3 resimden 3.
    • Belt Bracket Spacer

    • 2x M4x20 SHCS

  9. CR-10S PRO Y Axis Linear Rail Kit Installation, Endstop Braket mounting hardware Change: adım 9, 1 resimden 1.
    • Remove the stock endstop bracket screw

    • Replace endstop bracket mount screw with:

    • M3x10 SHCS, M3 Washer and M3 Sliding tnut

  10. CR-10S PRO Y Axis Linear Rail Kit Installation, Rail stopper install: adım 10, 2 resimden 1. CR-10S PRO Y Axis Linear Rail Kit Installation, Rail stopper install: adım 10, 2 resimden 2.
    • M5*10 BHCS

    • Acrylic stopper

  11. CR-10S PRO Y Axis Linear Rail Kit Installation, EndStop adjustment: adım 11, 1 resimden 1.
    • Adjust the Endstop position by sliding the endstop back until the nozzle tip lines up with the front edge of the bed when the endstop triggers.

Bitiş Çizgisi

3 farklı kişi bu kılavuzu tamamladı.

AJ Pereira

Üyelik tarihi: 05/29/20

2.652 İtibar

16 adet Kılavuz yazıldı

Ekip

Tiny Machines 3D Tiny Machines 3D üyesi

Community

5 Üyeler

40 adet Kılavuz yazıldı

0 Yorum

Yorum Ekle

İstatistikleri Görüntüle:

Son 24 Saat: 3

Son 7 gün: 16

Son 30 gün: 95

Her zaman: 3,298