4. Adımdaki Değişiklikler
Düzenleyen: ATUS Service Dept —
Düzenleme onaylandı tarafından ATUS Service Dept
- Önce
- Sonra
- Değiştirilmemiş
Adım Satırları
- | [title] |
---|---|
+ | [title] Spotlight Leads |
[* icon_caution] This step involves using a soldering iron. If you're not comfortable handling one, it's recommended to seek assistance from a qualified technician. | |
- | [* orange] |
+ | [* orange] With a soldering iron, carefully heat the connection points where the wires are attached. Once the solder melts, gently remove the wires. |
[* icon_note] The shorter lead connects to the top pin of the switch near the spotlight, whereas the longer lead gets connected to the 12V pad on the main PCB. | |
[* yellow] Short Lead | |
[* green] Long Lead |